kapil enterprises

Projects

Our Recent
Work Across India

Over 500+ successful construction projects delivered across India since 2003.

Poultry Shed Construction

Venky's India Limited
As pioneers in poultry shed construction, we understand the critical role infrastructure plays in livestock health and productivity. Our poultry sheds are engineered with advanced ventilation systems, weather-resistant materials, and climate-control features that create ideal conditions for your poultry operations.
Ahmednagar, Maharashtra, Solapur , Maval, Panshet, Hyderabad
5,00,000 sq. ft.
Poultry shed construction, ventilation systems, decksheet slab
Avg timeline for every poultry shed 3-4 months

Fabrication & Steel Structures

City Pride Group
we have completed fabrication projects for Venkys, Chaphalkar Karandikar Developers, and City Pride Group, consistently delivering high-quality, efficient, and durable steel construction solutions.
Pune, Maharashtra
25,000 sq. ft.
Steel structure fabrication, decksheet slab, concrete flooring
3-4 months

Glass Works

Chaphalkar Karandikar Developers
High-quality glass solutions delivered across residential, commercial, retail, and hospitality projects, with over 4,00,000 sq. ft. of installations completed for clients such as Ramkrishna Cine Exhibitors and Chaphalkar Karandikar Developers in Pune.
Pune
30 story building
Glass facade, Aluminium sliding doors and windows, interior partitions
4 months

Concrete Road Infrastructure

Venky's India Limited
High-strength concrete roads constructed in M20, M25, and M30 grades, built to withstand heavy industrial traffic and challenging site conditions. Completed over 2,00,000 sq. ft. of roadwork for Venky’s India Limited at Sangvi and Girinagar (Pune) with precise leveling, proper compaction, and durable finishing. Designed for long-term stability, low maintenance, and smooth operations across industrial and commercial sites.
Shirur, Maharashtra
2,00,000 sq. ft
Heavy-duty concrete roads, proper drainage, load-bearing surface
1km - 3 meter wide concrete road every 15 days